Rehabilitation of One Million Tank Reservoir
Project Owner: The Saline Water Conversion Corporation (SWCC)
Location: Makkah, KSA
Business Unit: SPD, Structural Systems, BMC, DCU
Scope of Work: Structural rehabilitation, Concrete repair, 3D Laser scanning and 3D Modeling for the existing condition of the tank. Replacement of the existing waterproofing system with a new EVA liner system and leak detection system, with total built-up area of 90,000 sqm & 30 m height, dam 460 m x 20 m. The project’s contract value was 107,000,000 SAR.